{"id":7009,"date":"2026-03-29T11:02:51","date_gmt":"2026-03-29T11:02:51","guid":{"rendered":"https:\/\/www.pekelyatirim.com\/portfolio\/adr-elektrik-odasi-jenerator-panosu-ve-trafo-yapim-isleri\/"},"modified":"2026-03-31T06:11:27","modified_gmt":"2026-03-31T06:11:27","slug":"adr-electrical-room-generator-panel-and-transformer-construction-works","status":"publish","type":"portfolio","link":"https:\/\/www.pekelyatirim.com\/en\/projelerimiz\/adr-elektrik-odasi-jenerator-panosu-ve-trafo-yapim-isleri\/","title":{"rendered":"ADR Electrical Room, Generator Panel and Transformer Construction Works"},"content":{"rendered":"<p>Discover our ADR electrical room, generator panel and transformer construction works project carried out by PEKEL in collaboration with T\u00fcprag Metal Mining in U\u015fak K\u0131\u015flada\u011f.<\/p>\n<h2>ADR Electrical Room, Generator Panel and Transformer Construction Works<\/h2>\n<p>As PEKEL, we continue to deliver specialized engineering solutions for the energy infrastructure and structural requirements of industrial plants. Our project located at the K\u0131\u015flada\u011f site, executed with T\u00fcprag Metal Madencilik San. ve Tic. A.\u015e. (Eldorado Gold), one of the leading organizations in the mining sector, is a concrete demonstration of high-standard <strong>construction<\/strong> and <strong>engineering<\/strong> excellence.<\/p>\n<h3>Project Details and Scope<\/h3>\n<p>This comprehensive <strong>project<\/strong>, executed in the K\u0131\u015flada\u011f, U\u015fak region has been meticulously planned to ensure the energy continuity and operational safety of the plant. All structural and technical arrangements required for the critically important electrical infrastructure of the ADR facilities have been implemented in compliance with international standards.<\/p>\n<p>The main activities carried out within the scope of the project are as follows:<\/p>\n<ul>\n<li><strong>ADR Electrical Room Construction:<\/strong> Custom-designed electrical room manufacturing for the protection of sensitive equipment and the safe management of power distribution.<\/li>\n<li><strong>Generator Panel Installation:<\/strong> Installation and integration of high-performance generator panels to meet uninterrupted power requirements.<\/li>\n<li><strong>Transformer Construction Works:<\/strong> Installation, infrastructure and connection works of transformer substations optimizing the energy load of the plant.<\/li>\n<\/ul>\n<h3>Trust and Quality in Industrial Construction Solutions<\/h3>\n<p>As PEKEL, <strong>in construction<\/strong> works, we aim not only to build structures, but also to construct long-lasting and efficient systems. In sites with demanding working conditions such as mining, occupational safety and technical precision are our highest priority criteria. The advanced <strong>manufacturing<\/strong> techniques we utilized in our K\u0131\u015flada\u011f project maximize the operational efficiency of the plant while guaranteeing the long-term durability of the system.<\/p>\n<h3>Why PEKEL?<\/h3>\n<p>With our experienced engineering staff and solution-oriented approach, we successfully manage complex industrial projects. Meeting the energy infrastructure requirements of a global partner like T\u00fcprag Metal Mining is proof of our competence and commitment to quality in the sector. From electrical infrastructure projects to reinforced concrete construction works, we prioritize professionalism in every detail and add value to our business partners.<\/p>\n<p>If you are looking for a professional <strong>construction and engineering<\/strong> partner for your industrial plants, you can bring your projects to life with PEKEL's expertise. With our structure that follows developments in the sector, integrates with technology and places occupational safety at the center, we are building the plants of the future today.<\/p>","protected":false},"excerpt":{"rendered":"<p>PEKEL olarak, T\u00fcprag Metal Madencilik (Eldorado Gold) i\u015f birli\u011fiyle U\u015fak K\u0131\u015flada\u011f&#8217;da ger\u00e7ekle\u015ftirdi\u011fimiz ADR elektrik odas\u0131, jenerat\u00f6r panosu ve trafo yap\u0131m i\u015fleri projemizi ke\u015ffedin. ADR Elektrik Odas\u0131, Jenerat\u00f6r Panosu ve Trafo Yap\u0131m \u0130\u015fleri PEKEL olarak, end\u00fcstriyel tesislerin enerji altyap\u0131s\u0131 ve yap\u0131sal gereksinimleri konusunda uzmanla\u015fm\u0131\u015f m\u00fchendislik \u00e7\u00f6z\u00fcmleri sunmaya devam ediyoruz. Madencilik sekt\u00f6r\u00fcn\u00fcn \u00f6nc\u00fc kurulu\u015flar\u0131ndan T\u00fcprag Metal Madencilik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":8886,"template":"","portfolio-category":[43],"class_list":["post-7009","portfolio","type-portfolio","status-publish","has-post-thumbnail","hentry","portfolio-category-beton-ve-celik-isleri"],"_links":{"self":[{"href":"https:\/\/www.pekelyatirim.com\/en\/wp-json\/wp\/v2\/portfolio\/7009","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pekelyatirim.com\/en\/wp-json\/wp\/v2\/portfolio"}],"about":[{"href":"https:\/\/www.pekelyatirim.com\/en\/wp-json\/wp\/v2\/types\/portfolio"}],"author":[{"embeddable":true,"href":"https:\/\/www.pekelyatirim.com\/en\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":0,"href":"https:\/\/www.pekelyatirim.com\/en\/wp-json\/wp\/v2\/portfolio\/7009\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pekelyatirim.com\/en\/wp-json\/wp\/v2\/media\/8886"}],"wp:attachment":[{"href":"https:\/\/www.pekelyatirim.com\/en\/wp-json\/wp\/v2\/media?parent=7009"}],"wp:term":[{"taxonomy":"portfolio-category","embeddable":true,"href":"https:\/\/www.pekelyatirim.com\/en\/wp-json\/wp\/v2\/portfolio-category?post=7009"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}